Sulawesi and Nusa Tenggara have the highest number of stalled power plant development projects. Several factors contributed to these projects being halted mid-way or failing to meet their targets, including inadequate project calculations and fuel supply issues.
Of the 34 stalled projects, 23 power plant projects are planned to be resumed. The remaining projects will be terminated. The total investment value of all stalled projects reaches Rp 11.2 trillion, with Rp 2.3 trillion representing the value of the 11 terminated projects. The total capacity of all halted power plants amounts to 633.8 megawatts.
Of the 23 projects to be resumed, 17 power plants are planned to be handled by the original contractors. The remaining six will be taken over by PT Perusahaan Listrik Negara (PLN) with an estimated budget of Rp 1 trillion.
"Disclosure: This is an AI-generated translation of the original article. We strive for accuracy,
but please note that automated translations may contain errors or slight inconsistencies."