Ministry of Energy and Mineral Resources (ESDM) Grants Rooftop Solar Power Plant (PLTS) Development Permits to PLN until 2028

Utility
Databoks Premium Lite
1
Erlina Fury Santika 10/06/2024 16:04 WIB
Image Loader
Memuat...

The Ministry of Energy and Mineral Resources (ESDM) has granted PLN permission to develop rooftop solar power plants (PLTS) through the Director General of Electricity's Decree Number 279.K/TL.03/DJL.

PLN Rooftop Solar Power Plant Development Capacity Quota per Year (2024-2028)
  • A Font Kecil
  • A Font Sedang
  • A Font Besar
databoks

Access single data

Ministry of Energy and Mineral Resources (ESDM) Grants Rooftop Solar Power Plant (PLTS) Development Permits to PLN until 2028

Want to get more access to Data Stories with a more affordable price? Subscribe.

By subscribing, you join us in presenting quality data.

Get:

  • Premium Data Stories access
  • Comfortable reading without ads
  • Download data in XLS, PDF, and image format
  • Access to data source information
See more
Basic
Rp100.000
Rp50.000/month
Professional
Rp100.000
Rp150.000/month
Institutional For organizations

We accept the following payments:

Qris OVO DANA ShopeePay AstraPay LinkAja
BCA Master Card Visa JCB
Qris OVO DANA ShopeePay AstraPay LinkAja BCA Master Card Visa JCB
Some payment methods are still in the process of being activated.

Popular Data

Loading...