Central Buton Regency Southeast Sulawesi Construction Cost Index Reaches 98.53 Points in 2025
- A Small
- A Medium
- A Bigger
The Construction Cost Index (CCI) for Central Buton Regency, Southeast Sulawesi stood at 98.53 points in 2025.
This value dropped by 4.56 points compared to the previous year, and decreased by 8.93 points over the last five years.
Referring to Statistics Indonesia (BPS) 2025 Provincial and District/City CCI publication: CCI is a price index measuring construction cost levels of a region relative to the reference city Surabaya.
Higher CCI values indicate more expensive building construction costs in that area.
At 98.53 points, construction costs in Central Buton Regency are equal to 0.985 times the construction costs in Surabaya.
Among 18 districts/cities in Southeast Sulawesi, Central Buton Regency ranks 16th lowest in CCI.
The lowest CCI was recorded in Kendari City (86.1 points), while the highest was in Wakatobi Regency (105.7 points).
"Disclosure: This is an AI-generated translation of the original article. We strive for accuracy, but please note that automated translations may contain errors or slight inconsistencies."
Related Data
Market Data
| Name | Value | % | |
|---|---|---|---|
| Inflasi yoy (Mei) | 3,08% | +0.66 | |
| Inflasi mom (Mei) | 0,28% | +0.15 | |
| Economic growth | 5,11% | +0.08 | |
| Pertumbuhan ekonomi (yoy) (Q1) | 5,61% | +4.08 | |
| Persentase kemiskinan (Des) | 7,50% | -0.75 | |
| Gini rasio (Sem2) | 0,38 | 0.00 | |
| Nilai Tukar USDIDR | 17.975 | -0.16 | |
| PDB ADHK (Q1) | 3.447,70 | -0.77 | |
| Neraca perdagangan (Apr) | 89,10 | -97.32 | |
| Ekspor Migas (Apr) | 1,16 | -9.81 | |
| Impor Migas (Apr) | 4,60 | +45.09 | |
| Ekspor (Apr) | 25,30 | +12.32 | |
| Impor (Apr) | 25,21 | +31.28 | |
| Kunjungan Wisman (Apr) | 1,25 | +14.75 | |
| NTP (Mei) | 113,79 | +1.34 |