Construction Cost Index of North Mamuju Regency, West Sulawesi 2025
- A Small
- A Medium
- A Bigger
The Construction Cost Index (CCI) for North Mamuju Regency, West Sulawesi stood at 93.71 points in 2025.
This value decreased by 3.57 points from the previous year, while recording an increase of 0.89 points over the last five years.
According to Statistics Indonesia (BPS) 2025 Provincial and District/City CCI publication: CCI is a price index measuring relative construction cost level of an area against the reference city, Surabaya.
Higher CCI value indicates more expensive construction costs in that location.
(Read: ASEAN Corruption Perception Index 2025: Singapore Ranked Cleanest)
At 93.71 points, construction costs in North Mamuju Regency equal 0.937 times the construction costs in Surabaya.
Among 6 districts/cities in West Sulawesi, North Mamuju Regency ranks 5th lowest for CCI.
Highest CCI was recorded in Polewali Mandar Regency (84.05 points), while lowest CCI was in Mamasa Regency (101.67 points).
2025 CCI values for all 6 areas in West Sulawesi:
- Polewali Mandar Regency: 84.05 points
- Majene Regency: 84.77 points
- Mamuju Regency: 87.58 points
- Central Mamuju Regency: 88.51 points
- North Mamuju Regency: 93.71 points
- Mamasa Regency: 101.67 points
(Read: Indonesia Gender Inequality Index Scores Continued Decline Through 2025)
"Disclosure: This is an AI-generated translation of the original article. We strive for accuracy, but please note that automated translations may contain errors or slight inconsistencies."
Related Data
Market Data
| Name | Value | % | |
|---|---|---|---|
| Inflasi yoy (Jul) | 2,88% | -0.46 | |
| Inflasi mom (Jul) | -0,14% | -0.58 | |
| Economic growth | 5,11% | +0.08 | |
| Pertumbuhan ekonomi (yoy) (Q1) | 5,61% | +4.08 | |
| Persentase kemiskinan (Des) | 7,50% | -0.75 | |
| Gini rasio (Sem2) | 0,38 | 0.00 | |
| Nilai Tukar USDIDR | 18.034 | +0.28 | |
| PDB ADHK (Q1) | 3.447,70 | -0.77 | |
| Neraca perdagangan (Jun) | -450,50 | -72.02 | |
| Ekspor Migas (Jun) | 1,07 | +40.52 | |
| Impor Migas (Jun) | 4,56 | +0.96 | |
| Ekspor (Jun) | 25,46 | +9.72 | |
| Impor (Jun) | 25,91 | +4.41 | |
| Kunjungan Wisman (Mei) | 1,38 | +10.69 | |
| NTP (Jul) | 116,16 | +1.32 |